Engagement is now closed.

Thank you to participants who provided feedback throughout public engagement. The What We Heard Report (WWHR) is available and provides a summary of engagement feedback.

The feasibility study will conduct a thorough review of site investigations and public engagement results to determine recreational needs and desires of the community along this corridor. The project is a feasibility study only and still requires funding to be confirmed if deemed feasible. The public will be informed through appropriate communications when project information becomes available.

Project Background

The municipality engaged with local community members and stakeholders to determine the feasibility of improving the Draper Trail. The Draper Trail was formerly a CN rail line that connects the rural RMWB communities of Draper and Saprae Creek. Assessment of existing conditions for the Draper trail that currently connects Saprae Creek with the designated OHV staging area at the Tom Weber Boat Launch, approximately 13.7 km in length.

The 2019 RMWB Parks Master Plan identified improvements to this trail as a priority for the Draper area.

The goal of this project is to conduct a thorough review of the existing trail to determine the vision for its future use. The project includes both site investigations by consultants and public and stakeholder engagement to determine the recreational needs and desires of the community along this corridor.

This project is for a feasibility study only. Which means, the purpose is to see what types of uses residents would like to see and examine what is possible for the trail.

Survey

Have your say!

This survey has concluded.


News Feed

Updates

Quick Poll

What mode of transportation are you most likely to use Draper trail for recreationally?

This quick poll has concluded.

Ideas

Share your vision for Draper Trail

Engagement on this project has concluded.